the original builder’s brief

  • Demolish sun room – a steel/glass/wood structure – no masonry
  • Leave sun room base and pave for patio area
  • Install sliding/bi-fold doors in end gable wall
  • Renovate dining room – new floor / wall plastering
  • Structural steelwork to open up space between kitchen and dining room
  • Structural steelwork to make two kitchens into one
  • Brick up side door
  • New kitchen with all necessary plumbing and electric configuration
  • Create some views and extra light through the house using some glazed “cut-outs” (windows) between living room/office/hallway/kitchen
  • Remove stud wall to remove box room and open up landing